The refurbishment of Darling Walk has led to another first for Rollco. The roof structure required the rolling of 610UB to an 'on edge' radius of 22m. Previously set at 27m this & one other project saw our capabilities increase to 25m and then 22m in the space of 6 months
The Darling Walk project, fabricated by Profab Industries, also required these tight radii to be rolled into huge 21m long beams. Unable to aquire the beams in time, Profab expertly fabricated 2*10.5m lengths which were then processed by Rollco.
This willingness to work with customers and trial new things keeps Rollco at the forefront of steel rolling and processing in Australia whilst helping our customers deliver projects on time and cost effectively.
|